The work climbing, including a comprehensive renovation of the roof of an old church, built in neo-Gothic style.
Due to the year of establishment (1896-1897) the work carried out under the supervision of the Provincial Inspector of Monuments.
Scope of work include:
- Cleaning the roof from corrosion,
- High-pressure washing a roof,
- The roof degreasing
- Painting the construction with epoxy primer paint
- Painting the roof with polyurethane topcoat paint
- Repair of damaged roof elements,
- Repairing the damaged tower.
Technical data:
Participation PROSPECT in the investment: 100%
The planned realization date: 30 days
Paiting climbing of steel chimney with height of 63m along with the repair of cracks and work associated
Scope of work:
- Height: 63m,
- Diameter: 1700mm,
- The degree of surface preparation: Sa2,
- Paint system: epoxy – polyurethane,
- The color target: RAL 7040
Scope of work:
- Sandblasting of the chimney to the degree Sa2,
- Painting chimney with epoxy primer,
- Paiting chimney Polyurethane topcoat
Anti-corrosion protection of pipeline DN250 along with a comprehensive replacement of insulation and dismantling steel construction.
Scope of works:
- Cleaning of anti-corrosion: the pillars supporting, pipeline with a total length of 500mb.
- Dismantling the existing thermal insulation the entire length of the pipeline
- Preparing the pipeline ground for painting in epoxy-polyurethane system,
- Climbing painting pipeline with supports,
- Installation of a new thermal insulation: ISOVER ULTIMATE U TFA 23
Technical data:
- Realization date: 90 days
- Participation PROSPECT GROUP Investment: 100%
- Value: 150.000 PLN
- Maximum temperature: tmax = 250 ° C
- Thermal conductivity: λD = 0,034 W/mK
The work climbing including a comprehensive renovation of anti-corrosion protection construction h110m torches along with the renovation of a daily obstruction marking.
Technical data:
- Type: the object Refining
- Dangerous: The first zone risk of explosion
- Height: 110 m,
- Hydro-sandblasting along with the cleaning 500 bar hight-pressure washer,
- Painting in epoxy polyurethane paint sets,
- Colours: RAL 3020, RAL 9010
The work climbing, including a comprehensive renovationl of steel construction silos for cement along with the realization of anti-corrosion protection.
Work of scope:
- Cleaning of steel construction tanks from 5 cm layer of concrete water pressure of 500 bar
- Degreasing structure,
- Painting of the construction at a height of epoxy primer,
- Climbing paiting silos construction with polyurethane topcoat
Technical data:
- Total area: 5100m2,
- Paint system: epoxy-polyurethane
- Painting method: airless spray, hand painting,
- The degree of surface preparation for painting: St 3
- The degree of corrosivity: C5-I
Industrial anti-corrosion four pipelines in the Copper Smelter “Głogów”
The scope of work related to comprehensive anti-corrosion protection:
The pipeline with a diameter of DN 900mm L=160mb:
- Abrasive blasting to Sa 2,5 steel construction
- The choice of the paint system in the environmental classification by PN_EN ISO 12944-2 w kategorii C4-I
- Anti-corrosion protection of the pipeline in three layer system total dry layer thickness of 280 μm surface color RAL 1016
- Marking direction.
Category durability for anti-corrosion realization – long, temperature in the range – external ambient temperatures
Gas pipeline with a diameter of DN 600mm L=70mb:
- Abrasive blasting to Sa 2,5 steel construction
- The choice of the paint system in the environmental classification by PN_EN ISO 12944-2 w kategorii C4-I
- Anti-corrosion protection of the pipeline in three layer system total dry layer thickness of 280 μm surface color RAL 1016
- Marking direction.
Category durability for anti-corrosion realization – long, temperature in the range – external ambient temperatures
Technical data:
- Customer: KGHM Polska Miedź S.A.
- Participation PROSPECT GROUP Sp. o.o. in Investment: 100%
- Branch responsible for the realization: Poznań
Climbing sandblasting the steel structure of the combustion chamber in order to prepare for the review of the leak .
The works were carried out on the construction site of a cogeneration unit at CFB EC Zofiówka in SEJ SA The scope of work was carried out within the framework of orders for sandblasting and execute a comprehensive corrosion protection with the development of anti-corrosion technology for all steel structures.
Anti-corrosion protection of steel structures turbines together with the preparation of the substrate. The work carried out in an explosive atmosphere and the difficult access of fresh air .
Scope of work:
- Cleaning of the steel structure according to the manufacturer’s paint ,
- Execution of corrosion protection of steel structures according to the guidelines developed with the customer – the Company from Finland .