      On February 14, 2019, work began related to the mountaineering vacuuming of the steel structure along with the paint coating on the area of the fluidized block at EC Zofiówka with a capacity of 75 MW.

      Scope of work:

      • Cleaning the steel structure (vacuuming) with an area of 27,000 m2,
      • Cleaning of installations (boiler, pipelines, devices, channels),
      • Painting railings and ladders,
      • Painting gas paths,
      • Removal of contaminants on the sorbent tank,

      Total order value (including previous orders) approximately PLN 1,445,250 (gross)