A comprehensive renovation of the footbridge for pedestrians

Anti-corrosion protection includes comprehensive anti-corrosion protection footbridge for pedestrians over the river Soła in Oświęcim

Scope of work:

  • Cleaning for Sa2,5 (sandblasting) of steel construction,
  • Painting steel construction in three layer system (2x epoxy primer, 1x polyurethane surface)
  • Painting steel construction pipeline in polyurethane paints system,
  • Reprofiling constructions supports.

Technical data:

  • The area of steel constructions: 1700m2,
  • The area of pipelines: 400m2