Works related to the comprehensive renovation and reinforcement of the steel structure of the TN-21 carburizing platform for PGNiG Termika Energetyka Przemysłowa in Moszczenica are in progress.
The scope of work includes:
- Development of a renovation technology,
- Abrasive blast cleaning of the entire steel structure to Sa 2/5 grade,
- Replacement of a part of the platform supporting structure,
- Installation of the structure strengthening the platform,
- Execution of anti-corrosion protection of steel structures in the epoxy-polyurethane system,
- Implementation of a new deck wall covering made of T45 trapezoidal sheet metal,
- Insulation of the platform walls,
- Inspection and overhaul of the deck bearings,
Technical data:
- Platform length: 57.5 m
- Location: 237 m above sea level
- Area for abrasive blasting: 2500 m2,
- Amount of steel structure replaced: 10,000 kg,
The share of PROSPECT GROUP Sp. z o.o. in investment: 100%
Approximate value of the renovation: PLN 400,000
20 March 2021