      Dismantling of the light tower

      Climbing work including a full renovation of the steel structure of the old light tower with its reinforcement and corrosion protection.

      Scope of climbing works:

      • Cleaning of all gratings, improving welds and corrosion protection,
      • Dismantling of the higher safety cage structure,
      • Reinforcing the steel structure nodes connecting segments of the tower,
      • Dismantling the remains of the electrical installation and brackets,
      • Improving sheet metal weldings on the platforms and corrosion protection,
      • Welding a new sheet metal on the platforms,
      • Cleaning with total corrosion protection of steel structure,

      Lead time: 14 days,
      Total weight of the dismantled steel structure: 700 kg,
      Total weight of the steel structure: 400 kg,
      Paint system: KCC Paint,
      Target colour of the facility: RAL 7035

      11 February 2013

      Other accomplishments

      Umowa z Lotos Terminale S.A. – naprawa podpór rurociągu

      Anticorrosive mountaineering painting of the exhaust chimney

      Obstruction painting of the GSM h40 tower

      Corrosion protection of steel structures of silos

      Security R15 fire protection

      Washing elevation M1 Shopping Center

      See all accomplishment