      Renovation of steel chimney h63m

      Paiting climbing of steel chimney with height of 63m along with the repair of cracks and work associated

      Scope of work:

      • Height: 63m,
      • Diameter: 1700mm,
      • The degree of surface preparation: Sa2,
      • Paint system: epoxy – polyurethane,
      • The color target: RAL 7040

      Scope of work:

      • Sandblasting of the chimney to the degree Sa2,
      • Painting chimney with epoxy primer,
      • Paiting chimney Polyurethane topcoat
      4 July 2013